What percentage of the 48-km railway line between Banihal to Sangaldan passes through tunnels?

Answer & Explanation

Click "Check Answer" to reveal
Correct Answer: Option C — 90%
• The Project: The Banihal-Sangaldan section is a critical 48.1 km stretch of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project. It was inaugurated in February 2024.

• Engineering Marvel: Due to the extremely rugged and mountainous terrain of the Pir Panjal range, the vast majority of this rail line is constructed underground.

• Tunnel Statistics: Approximately 43.37 km of the 48.1 km stretch consists of tunnels. This equates to roughly 90% of the total length.

• Notable Feature: This section includes Tunnel T-50, which is currently the longest transportation tunnel in India, stretching over 12.77 km.
Answer verified by Quintessence Classes faculty — Karan Nagar, Srinagar.

About this question

JKSSB Patwari 2024 Written

Details

Exam JKSSB
Recruitment Patwari
Stage Written
Year 2024
View all questions from this paper

Practice 1,142+ more PYQs interactively

Filter by subject, year, and exam in real time. Get instant feedback, detailed explanations, and track your progress.

Open practice portal